365 Nutrition

RDX Sports 6 Inch Leather Gym Belt

£23.99

Harness your bodies natural power with this extra wide 6 Inch leather weight lifting belt.

Designed to give you the highest levels of back support and therefore giving you better strength and confidence to stack to the max.

Made from a special Nubuck leather that feels gel-like when compressed, you’ll have all the cushioning you need for the toughest workouts. And this exercise belt also features a contoured design for extra comfort, shock absorbing properties to protect your back and abdomen, plus rivets and buckle for even more toughness. All this whilst feeling incredibly soft on the skin.

Description

RDX Sports 6 Inch Leather Gym Belt

RDX Sports at 365 Nutrition. Our premier gym and sporting accessories partner from the very beginning.
Why RDX?
The team at 365 Nutrition carefully select product manufacturers based on a number of principles and values:
  • Quality
  • Value
  • End user / Customer experience
  • Professionalism
  • Innovation
  • Material Selection
  • Returns process
RDX Sports exceed our standards in all of the above considerations, and therefore remain our go to partner.

Product Description:

Harness your bodies natural power with this extra wide 6 Inch leather weight lifting belt.

Designed to give you the highest levels of back support and therefore giving you better strength and confidence to stack to the max.

Made from a special Nubuck leather that feels gel-like when compressed, you’ll have all the cushioning you need for the toughest workouts. And this exercise belt also features a contoured design for extra comfort, shock absorbing properties to protect your back and abdomen, plus rivets and buckle for even more toughness. All this whilst feeling incredibly soft on the skin.

Accredited by Global Powerlifting Congress, approved and recognized the International Power-lifting League (IPL) & United States Power-lifting Association (USPA)

Key Product Features:

  • Oil tanned Nubuck leather construction with a gel-like touch to support and cushion
  • Designed to be soft on the skin yet completely indestructible in the gym
  • Shock absorbing abilities to deliver a pain-free experience
  • Contoured design to mould to your body and give you the ultimate comfort
  • Stitched underpinning with rivets and buckle for added strength and resilience

Additional information

Weight 2.5 kg
Dimensions 13 × 50 × 3 cm
Size

XL, L, M, S, 2XL

RDX Sports 6 Inch Black Leather Lifting Belt Combined View Photo
You're viewing: RDX Sports 6 Inch Leather Gym Belt £23.99
Select options
Message Us
Shopping cart close